Hi Ian and Paul -  

I hope you and your team are safe, well and settled into a new routine and structure during these unprecedented times.
We haven't been in touch since our last presentation at Walker Macy back in 2019, and I wanted to reach out to let you know our new presentation with a broader scope, and to better support remote learning during the pandemic.

We also added a Henry waterproofing segment with more structural and membrane details. The presentation is AIA approved and comes with CE and HSW credits, and featuring Green Roof Professional (GRP) and Building Envelope (BE) experts in the field.

Please meet the team, and click for official AIA program description.
 
Looking forward to meeting with you and your staff.
 
Your Green Roof Team:         

Liz Morris, Director of Vegetated Roofing - Henry

Raoul Meekcoms, Principal - Building Envelope Reps.

Cody Hakala, Technical Sales - Building Envelope Reps.

Gabe Varga, President - Diadem USA, Inc,
Check our availablity to Schedule a Presentation
Provider: Diadem USA, Inc.
Course: # 011614
Course Title: Green up the Roof 601
Lenght: 1 hour
Credits: 1 credit point
HSW/SD: Yes
Learning Objectives:
  1. Giving a brief update on the green roof industry, about new policies, technical standards and trends.
  2. Explain the most common green-roof technologies, their details, and correct solutions per client and construction needs.
  3. Going through case studies that demonstrate how to recognize green-roof design errors or omissions and instruct proper installation and maintenance.
  4. Explain risks associated with green roofs - especially fall hazards, address this point with solutions.
  5. Review reference projects and discuss their lessons we learned.

#1 ANSI/SPRI VR-1 2018
Procedure for Investigating Resistance to Root
or Rhizome Penetration on Vegetative Roofs


Single Source Warranty

We offer a comprehensive solution for a more competitive price level, and yet covering the whole roof package with one hand.

#2. This section will review the proper methodology for selecting the appropriate green-roof system based on the building and its construction, as well as system installation and utility needs. Beyond the layers you need for a green roof we'll address most of the details with a comprehensive set of products and components like retention boards, drain boxes, edgers, guardrails, safety devices, for every type of greenroofs and media depths.

#3. Originally it was a warehouse, built in 1895 in the Pearl district of Portland, ORE.
Reopened on September 6th 2001, and became the first LEED Gold awarded building of the state. The green roof unfortunately had to be replaced later...

#4. OSHA § 1926.501 Duty to have fall protection.
(b)(1)  Unprotected sides and edges.

Each employee on a working surface with an unprotected edge which is 6 feet (1.8 m) or more above a lower level shall be protected from falling
#5 One in two Americans is covered by a hospital that uses Epic Systems to run their software—over 150 million people, and now Diadem has been selected to secure edge of the roof patios at their new campus buildings in Verona, WI with the non-penetrating Garda-600 guradrail system.

 

This presentation is sponsored by:
Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list

*|IF:REWARDS|* *|HTML:REWARDS|* *|END:IF|*